Preparation:

The environment in which the floor is to be installed must be controlled with the temperature between 65°F and 95°F (18°C and 3°C) and the relative humidity between 10% and 65%. If installing over concrete, the slab temperature should not be less than 65°F (18°C). These conditions must be maintained for at least 48 hours before, during, and 48 hours after the installation. It is also recommended that the wood floor to be installed be acclimatized to these conditions.

This website supports the following browsers:

IE: 5.0, 5.5, 6.0, 7.0, 8.0   Update to IE 8.0
Firefox: 3.0.x, 3.5.x, 3.6.x   Upgrade to Firefox 3.6.3
AOL: 6.0, 9.0, 9.1, 9.5   Upgrade to AOL 9.5
Chrome: 1.x.xxx, 2.x.xxx, 3.x.xxx, 4.x.xxx, 5.x.xxx   Upgrade Chrome
Safari: 3.2.3, 3.1.1, 4.0   Upgrade to Safari 4